CHS | Mitchell, SD

Img 5421 (1)

A facility that keeps up with demand, built for what’s next.

We installed a new ground pile and a 20,000 BPH receiving pit, cutting unloading time for semi-trucks. This reduced wait times and increased the number of trucks they can move through in a day. We also added a new 100,000 BPH Bulkweigher and related spouting for more precise weight measurements and being able to load a unit train in eight hours. Another part of the project was updating their fertilizer blending tower to a new 5-ton HIM Blender. Our team reworked the tower floors and replaced the existing blending equipment, resulting in faster load times and lower labor costs.

Recent Posts

Three grain bins with the sun setting behind them

West Central Ag Services | Ulen, MN

More storage, so harvest never has to wait.

Read Article
0n2a3293 (1)

West Central Ag Services | Beltrami, MN

Clean air and clear spaces to keep workers safe.

Read Article
Image000007 (1)

CHS | French, MN

A system that adapts to your schedule, not the other way around.

Read Article